Checked
Coos County, NH Energy
Electric utilities, power plants and charging stations in Coos County, New Hampshire.
- New Hampshire home electricity
- 26.60¢/kWh
- July 2026
- Regular gas, region
- $4.25/gal
- New England (PADD 1A)
- EV charging stations
- 24
- 45 ports
- Electric utilities
- 2
- Serving Coos County
Electric utilities serving Coos County
As reported to EIA for 2025. A utility may serve only part of the county. Customers and prices are for its whole New Hampshire service area
Swipe the table sideways to see more columns.
| Utility | Customers in state | Home price | Home bill |
|---|---|---|---|
| Public Service Co of NHInvestor Owned | 546,815 | 24.17¢/kWh | $150/mo |
| New Hampshire Elec Coop IncCooperative | 85,428 | 24.70¢/kWh | $151/mo |
EV charging in Coos County
24 public stations, DC fast first
- Eastern Depot Restaurant - Tesla Supercharger (Citgo)
443 Main St, Gorham, NH 03581
4 DC fast · Tesla Supercharger · CCS (J1772 Combo), Tesla (NACS)
- Ecodrive Auto Group
485 Main St, Gorham, NH 03581
2 DC fast · 2 Level 2 · Red E · J1772 (Level 2), CCS (J1772 Combo)
- 64 Trooper Leslie G Lord Mem Hwy
64 Trooper Leslie G Lord Mem Hwy, Colebrook, NH 03576
2 DC fast · EV Connect · CHAdeMO, CCS (J1772 Combo)
Temporarily unavailable - GMG Dcfc Lancaster X1
202 North Main Street, Lancaster, NH 03584
1 DC fast · ChargePoint · CHAdeMO, CCS (J1772 Combo)
- GMG Dcfc Lancaster X2
202 North Main Street, Lancaster, NH 03584
1 DC fast · ChargePoint · CHAdeMO, CCS (J1772 Combo)
- Appalachian Mountain Club - Highland Center at Crawford Notch
Route 302, Bretton Woods, NH 03575
4 Level 2 · Non-networked · J1772 (Level 2)
- Mount Washington Auto Road
1 Mount Washington Auto Rd, Greens Grant, NH 03581
4 Level 2 · Non-networked · J1772 (Level 2)
- Mt. Washington Auto Road - Tesla Destination
1 Mount Washington Auto Rd, Gorham, NH 03581
3 Level 2 · Tesla Destination · Tesla (NACS)
- GMG Dcfc Lancaster AC X3
202 North Main Street, Lancaster, NH 03584
2 Level 2 · ChargePoint · J1772 (Level 2)
Power plants in Coos County
301 MW of operating capacity
Swipe the table sideways to see more columns.
| Plant | Fuel | Capacity |
|---|---|---|
| Granite Reliable Power | Wind | 99.0 MW |
| Burgess BioPower | Biomass | 75.0 MW |
| Berlin Gorham | Hydroelectric | 44.3 MW |
| NE Renewable Whitefield, LLC | Biomass | 19.9 MW |
| Lost Nation | Petroleum | 18.0 MW |
| Smith (NH) | Hydroelectric | 15.0 MW |
| Jericho Power | Wind | 14.3 MW |
| Pontook Hydro Facility | Hydroelectric | 10.5 MW |
| Errol Hydroelectric Project | Hydroelectric | 3.0 MW |
| Gorham | Hydroelectric | 2.2 MW |
Electricity rates and gas prices are state or regional averages. Utility service areas come from EIA Form 861 and are listed by county, so a utility listed here may not serve every address in the county.
Frequently asked questions
- What electric company serves Coos County?
- Public Service Co of NH, New Hampshire Elec Coop Inc report serving Coos County to EIA. Check your bill or address with the utility to confirm which one serves you.
- How many EV charging stations are in Coos County?
- There are 24 public EV charging stations in Coos County with 45 ports, 7 of them with DC fast charging.
- Are there power plants in Coos County?
- Yes. Coos County has 10 operating power plants with 301 MW of capacity. The largest is Granite Reliable Power (99.0 MW, wind).