Checked
Atwell Island
20.2 MW solar power plant · Tulare County, California
- Operating capacity
- 20.2 MW
- 1 generator
- Main fuel
- Solar
- First unit online
- 2013
- Generation, 2023
- 33 GWh
Plant details
- EIA plant ID
- 58366
- Operator
- SPS Atwell Island LLC
- Sector
- IPP Non-CHP
- County
- Tulare County
- Balancing authority
- CISO
- Location
- 35.8950, -119.5108
Operating generators
Nameplate capacity and the month each began operating
Swipe the table sideways to see more columns.
| Generator | Fuel | Capacity | Online | Status |
|---|---|---|---|---|
| 1Solar Photovoltaic | Solar | 20.2 MW | Mar 2013 | Operating |
Generation and emissions, 2023
EPA eGRID annual data
- Net generation
- 33 GWh
- Capacity factor
- 18.9%
Nearby power plants
Within 25 miles
Swipe the table sideways to see more columns.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| White River Solar | Solar | 20.0 MW | 3.2 mi |
| Alpaugh BESS | Battery storage | 10.0 MW | 3.6 mi |
| Angela Solar Project | Battery storage | 80.0 MW | 3.7 mi |
| Alpaugh North | Solar | 20.0 MW | 3.8 mi |
| Alpaugh 50 | Solar | 50.0 MW | 4.2 mi |
| Atwell Island West Solar | Solar | 20.0 MW | 6.2 mi |
| Tulare CSG LLC | Solar | 3.0 MW | 6.6 mi |
| Case Vander Eyk, Jr Dairy Solar | Solar | 1.2 MW | 8.5 mi |
Frequently asked questions
- How much power can Atwell Island produce?
- Atwell Island has 20.2 MW of operating nameplate capacity across 1 generator as of August 2026.
- Who operates Atwell Island?
- EIA lists SPS Atwell Island LLC as the operator of Atwell Island.
- How much electricity did Atwell Island generate?
- Atwell Island reported 33 GWh of net generation in 2023, according to EPA eGRID.
Source: U.S. Energy Information Administration, Form EIA-860M (August 2026); U.S. EPA eGRID2023 · Data for August 2026