Checked
Crimson
350 MW battery storage power plant · Riverside County, California
- Operating capacity
- 350 MW
- 2 generators
- Main fuel
- Battery storage
- First unit online
- 2022
- Generation, 2023
- -60 GWh
Plant details
- EIA plant ID
- 65140
- Operator
- RE Crimson LLC
- Sector
- IPP Non-CHP
- County
- Riverside County
- Balancing authority
- CISO
- Battery energy
- 1,400 MWh
- Location
- 33.5735, -114.8145
Operating generators
Nameplate capacity and the month each began operating
Swipe the table sideways to see more columns.
| Generator | Fuel | Capacity | Online | Status |
|---|---|---|---|---|
| SWSH1Batteries | Battery storage | 200 MW | Oct 2022 | Operating |
| SWSH2Batteries | Battery storage | 150 MW | Oct 2022 | Operating |
Generation and emissions, 2023
EPA eGRID annual data
- Net generation
- -60 GWh
Net generation is negative when a plant uses more electricity than it sends to the grid, which is normal for storage plants.
Nearby power plants
Within 25 miles
Swipe the table sideways to see more columns.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Desert Quartzite | Solar | 450 MW | 3.6 mi |
| Solar Blythe LLC | Solar | 21.0 MW | 4.2 mi |
| Chuckawalla Valley State Prison | Solar | 1.0 MW | 5.2 mi |
| SunEdison Ironwood State Prison | Solar | 1.0 MW | 6.0 mi |
| Chuckawalla Solar | Solar | 4.0 MW | 6.0 mi |
| Ironwood Solar LLC | Solar | 4.0 MW | 6.0 mi |
| Blythe Solar III, LLC Hybrid | Solar | 252 MW | 7.1 mi |
| Solar Blythe 2 | Solar | 20.0 MW | 7.5 mi |
Frequently asked questions
- How much power can Crimson produce?
- Crimson has 350 MW of operating nameplate capacity across 2 generators as of August 2026.
- Who operates Crimson?
- EIA lists RE Crimson LLC as the operator of Crimson.
- How much electricity did Crimson generate?
- Crimson reported -60 GWh of net generation in 2023, according to EPA eGRID.
Source: U.S. Energy Information Administration, Form EIA-860M (August 2026); U.S. EPA eGRID2023 · Data for August 2026