Mojave Solar Project
280 MW solar power plant · San Bernardino County, California
- Operating capacity
- 280 MW
- 2 generators
- Main fuel
- Solar
- First unit online
- 2014
- Generation, 2023
- 612 GWh
Plant details
- EIA plant ID
- 57331
- Operator
- Mojave Solar LLC
- Sector
- IPP Non-CHP
- County
- San Bernardino County
- Balancing authority
- CISO
- Location
- 35.0177, -117.3391
Operating generators
Nameplate capacity and the month each began operating
Swipe the table sideways to see more columns.
| Generator | Fuel | Capacity | Online | Status |
|---|---|---|---|---|
| MSP1Solar Thermal without Energy Storage | Solar | 140 MW | Dec 2014 | Operating |
| MSP2Solar Thermal without Energy Storage | Solar | 140 MW | Dec 2014 | Operating |
Generation and emissions, 2023
EPA eGRID annual data
- Net generation
- 612 GWh
- Capacity factor
- 25.0%
Nearby power plants
Within 25 miles
Swipe the table sideways to see more columns.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Lockhart Solar PV IV, LLC | Solar | 80.0 MW | 1.0 mi |
| Lockhart Solar PV, LLC | Solar | 169 MW | 1.3 mi |
| Lockhart Ess, LLC | Battery storage | 45.0 MW | 1.4 mi |
| Desert Breeze Solar, LLC | Solar | 125 MW | 1.5 mi |
| Lockhart Solar PV II | Solar | 144 MW | 1.9 mi |
| Resurgence Solar | Solar | 165 MW | 12 mi |
| Resurgence Solar II | Solar | 88.0 MW | 12 mi |
| Aratina Solar Center 1A | Solar | 195 MW | 13 mi |
Frequently asked questions
- How much power can Mojave Solar Project produce?
- Mojave Solar Project has 280 MW of operating nameplate capacity across 2 generators as of August 2026.
- Who operates Mojave Solar Project?
- EIA lists Mojave Solar LLC as the operator of Mojave Solar Project.
- How much electricity did Mojave Solar Project generate?
- Mojave Solar Project reported 612 GWh of net generation in 2023, according to EPA eGRID.
Source: U.S. Energy Information Administration, Form EIA-860M (August 2026); U.S. EPA eGRID2023 · Data for August 2026