Mojave Solar Project

280 MW solar power plant · San Bernardino County, California

Operating capacity
280 MW
2 generators
Main fuel
Solar
First unit online
2014
Generation, 2023
612 GWh

Plant details

EIA plant ID
57331
Operator
Mojave Solar LLC
Sector
IPP Non-CHP
Balancing authority
CISO

Operating generators

Nameplate capacity and the month each began operating

Swipe the table sideways to see more columns.

GeneratorFuelCapacityOnlineStatus
MSP1Solar Thermal without Energy StorageSolar140 MWDec 2014Operating
MSP2Solar Thermal without Energy StorageSolar140 MWDec 2014Operating

Generation and emissions, 2023

EPA eGRID annual data

Net generation
612 GWh
Capacity factor
25.0%

Nearby power plants

Within 25 miles

Swipe the table sideways to see more columns.

PlantFuelCapacityDistance
Lockhart Solar PV IV, LLCSolar80.0 MW1.0 mi
Lockhart Solar PV, LLCSolar169 MW1.3 mi
Lockhart Ess, LLCBattery storage45.0 MW1.4 mi
Desert Breeze Solar, LLCSolar125 MW1.5 mi
Lockhart Solar PV IISolar144 MW1.9 mi
Resurgence SolarSolar165 MW12 mi
Resurgence Solar IISolar88.0 MW12 mi
Aratina Solar Center 1ASolar195 MW13 mi

Frequently asked questions

How much power can Mojave Solar Project produce?
Mojave Solar Project has 280 MW of operating nameplate capacity across 2 generators as of August 2026.
Who operates Mojave Solar Project?
EIA lists Mojave Solar LLC as the operator of Mojave Solar Project.
How much electricity did Mojave Solar Project generate?
Mojave Solar Project reported 612 GWh of net generation in 2023, according to EPA eGRID.

Source: U.S. Energy Information Administration, Form EIA-860M (August 2026); U.S. EPA eGRID2023 · Data for August 2026