Checked
Terminus Hydroelectric Project
20.1 MW hydroelectric power plant · Tulare County, California
- Operating capacity
- 20.1 MW
- 1 generator
- Main fuel
- Hydroelectric
- First unit online
- 1990
- Generation, 2023
- 61 GWh
Plant details
- EIA plant ID
- 54343
- Operator
- Eagle Creek Renewable Energy, LLC
- Sector
- IPP Non-CHP
- County
- Tulare County
- Balancing authority
- CISO
- Location
- 36.4156, -119.0069
Operating generators
Nameplate capacity and the month each began operating
Swipe the table sideways to see more columns.
| Generator | Fuel | Capacity | Online | Status |
|---|---|---|---|---|
| GEN1Conventional Hydroelectric | Hydroelectric | 20.1 MW | Mar 1990 | Operating |
Generation and emissions, 2023
EPA eGRID annual data
- Net generation
- 61 GWh
- Capacity factor
- 34.8%
Nearby power plants
Within 25 miles
Swipe the table sideways to see more columns.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Kaweah 2 | Hydroelectric | 1.8 MW | 7.7 mi |
| Kaweah 1 | Hydroelectric | 2.3 MW | 8.8 mi |
| Kaweah 3 | Hydroelectric | 4.8 MW | 11 mi |
| Exeter Solar | Solar | 3.5 MW | 12 mi |
| Ivanhoe Solar | Solar | 3.5 MW | 14 mi |
| Visalia CSG LLC | Solar | 3.0 MW | 15 mi |
| Lindsay Solar | Solar | 4.0 MW | 16 mi |
| Visalia - (CA) | Solar | 5.2 MW | 16 mi |
Frequently asked questions
- How much power can Terminus Hydroelectric Project produce?
- Terminus Hydroelectric Project has 20.1 MW of operating nameplate capacity across 1 generator as of August 2026.
- Who operates Terminus Hydroelectric Project?
- EIA lists Eagle Creek Renewable Energy, LLC as the operator of Terminus Hydroelectric Project.
- How much electricity did Terminus Hydroelectric Project generate?
- Terminus Hydroelectric Project reported 61 GWh of net generation in 2023, according to EPA eGRID.
Source: U.S. Energy Information Administration, Form EIA-860M (August 2026); U.S. EPA eGRID2023 · Data for August 2026