Skip to content

Checked

TWC

1.2 MW solar power plant · Tulare County, California

Operating capacity
1.2 MW
1 generator
Main fuel
Solar
First unit online
2024

Plant details

EIA plant ID
67863
Operator
Bravo REC Management LLC
Sector
Industrial Non-CHP
Balancing authority
CISO

Operating generators

Nameplate capacity and the month each began operating

Swipe the table sideways to see more columns.

GeneratorFuelCapacityOnlineStatus
TWCSolar PhotovoltaicSolar1.2 MWAug 2024Operating

Nearby power plants

Within 25 miles

Swipe the table sideways to see more columns.

PlantFuelCapacityDistance
Tulare 1 and 2Solar3.0 MW5.5 mi
Central CA Fuel Cell 1, LLCNatural gas2.8 MW5.9 mi
City of Tulare Water FacilitySolar9.2 MW5.9 mi
Tulare BioMAT Fuel CellBiomass2.8 MW6.0 mi
Cottonwood Solar, LLC (City of Corcoran)Solar12.0 MW6.0 mi
1875 West Street SolarSolar2.0 MW6.2 mi
Corcoran Irrigation District Floating SoSolar3.1 MW6.6 mi
Cid Solar, LLCSolar20.0 MW6.6 mi

Frequently asked questions

How much power can TWC produce?
TWC has 1.2 MW of operating nameplate capacity across 1 generator as of August 2026.
Who operates TWC?
EIA lists Bravo REC Management LLC as the operator of TWC.

Source: U.S. Energy Information Administration, Form EIA-860M (August 2026) · Data for August 2026