Wright Solar Park
200 MW solar power plant · Merced County, California
- Operating capacity
- 200 MW
- 1 generator
- Main fuel
- Solar
- First unit online
- 2019
- Generation, 2023
- 463 GWh
Plant details
- EIA plant ID
- 59525
- Operator
- Wright Solar Park LLC
- Sector
- IPP Non-CHP
- County
- Merced County
- Balancing authority
- CISO
- Location
- 37.0094, -120.9572
Operating generators
Nameplate capacity and the month each began operating
Swipe the table sideways to see more columns.
| Generator | Fuel | Capacity | Online | Status |
|---|---|---|---|---|
| FRWSPSolar Photovoltaic | Solar | 200 MW | Dec 2019 | Operating |
Generation and emissions, 2023
EPA eGRID annual data
- Net generation
- 463 GWh
- Capacity factor
- 26.4%
Nearby power plants
Within 25 miles
Swipe the table sideways to see more columns.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Merced 1 PV | Solar | 3.0 MW | 4.6 mi |
| Lara 2 Hybrid | Battery storage | 1.6 MW | 4.6 mi |
| W R Gianelli | Pumped storage hydro | 424 MW | 7.8 mi |
| ONeill | Pumped storage hydro | 25.2 MW | 7.9 mi |
| Godinho Dairy Digester | Biomass | 2.0 MW | 8.7 mi |
| Vega Solar | Solar | 20.0 MW | 9.5 mi |
| Quinto Solar PV Project | Solar | 108 MW | 9.8 mi |
| Dinosaur Point | Wind | 17.4 MW | 12 mi |
Frequently asked questions
- How much power can Wright Solar Park produce?
- Wright Solar Park has 200 MW of operating nameplate capacity across 1 generator as of August 2026.
- Who operates Wright Solar Park?
- EIA lists Wright Solar Park LLC as the operator of Wright Solar Park.
- How much electricity did Wright Solar Park generate?
- Wright Solar Park reported 463 GWh of net generation in 2023, according to EPA eGRID.
Source: U.S. Energy Information Administration, Form EIA-860M (August 2026); U.S. EPA eGRID2023 · Data for August 2026