Checked
Gary Court 1 & 2
5.2 MW petroleum power plant · Southeastern Connecticut Planning Region, Connecticut
- Operating capacity
- 5.2 MW
- 2 generators
- Main fuel
- Petroleum
- First unit online
- 2010
- Generation, 2023
- 466 MWh
Plant details
- EIA plant ID
- 57601
- Operator
- Connecticut Mun Elec Engy Coop
- Sector
- Electric Utility
- Balancing authority
- ISNE
- Location
- 41.3367, -72.0200
Operating generators
Nameplate capacity and the month each began operating
Swipe the table sideways to see more columns.
| Generator | Fuel | Capacity | Online | Status |
|---|---|---|---|---|
| GC1Petroleum Liquids | Petroleum | 2.6 MW | Jul 2010 | Operating |
| GC2Petroleum Liquids | Petroleum | 2.6 MW | Jul 2010 | Operating |
Generation and emissions, 2023
EPA eGRID annual data
- Net generation
- 466 MWh
- Capacity factor
- 1.0%
- CO2 emissions
- 404 tons
- CO2 emission rate
- 1,732 lb/MWh
Nearby power plants
Within 25 miles
Swipe the table sideways to see more columns.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Water Treatment 1 & 2 | Petroleum | 5.2 MW | 1.3 mi |
| Pfizer Groton Fuel Cell | Natural gas | 5.6 MW | 2.7 mi |
| Pfizer Groton Plant | Natural gas | 37.5 MW | 3.1 mi |
| Bridge Street 1 & 2 | Petroleum | 5.2 MW | 3.7 mi |
| CMEEC - Polaris Park Solar Hybrid | Solar | 4.3 MW | 4.3 mi |
| Yale New Haven - New London | Natural gas | 1.8 MW | 4.5 mi |
| Fishers Island 1 | Petroleum | 2.6 MW | 4.7 mi |
| Cmeec - Navy NE Trident | Solar | 1.0 MW | 5.1 mi |
Frequently asked questions
- How much power can Gary Court 1 & 2 produce?
- Gary Court 1 & 2 has 5.2 MW of operating nameplate capacity across 2 generators as of August 2026.
- Who operates Gary Court 1 & 2?
- EIA lists Connecticut Mun Elec Engy Coop as the operator of Gary Court 1 & 2.
- How much electricity did Gary Court 1 & 2 generate?
- Gary Court 1 & 2 reported 466 MWh of net generation in 2023 and 404 tons of carbon dioxide emissions, according to EPA eGRID.
Source: U.S. Energy Information Administration, Form EIA-860M (August 2026); U.S. EPA eGRID2023 · Data for August 2026