Conception
50.4 MW wind power plant · Nodaway County, Missouri
- Operating capacity
- 50.4 MW
- 1 generator
- Main fuel
- Wind
- First unit online
- 2008
- Generation, 2023
- 97 GWh
Plant details
- EIA plant ID
- 56537
- Operator
- CR Clearing, LLC
- Sector
- IPP Non-CHP
- County
- Nodaway County
- Balancing authority
- AECI
- Location
- 40.2572, -94.6722
Operating generators
Nameplate capacity and the month each began operating
Swipe the table sideways to see more columns.
| Generator | Fuel | Capacity | Online | Status |
|---|---|---|---|---|
| 1Onshore Wind Turbine | Wind | 50.4 MW | Apr 2008 | Operating |
Generation and emissions, 2023
EPA eGRID annual data
- Net generation
- 97 GWh
- Capacity factor
- 22.0%
Nearby power plants
Within 25 miles
Swipe the table sideways to see more columns.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Nodaway | Natural gas | 316 MW | 6.6 mi |
| Stanberry | Natural gas | 4.3 MW | 7.5 mi |
| Clear Creek Wind | Wind | 242 MW | 14 mi |
| Bluegrass Ridge | Wind | 56.7 MW | 15 mi |
| White Cloud Wind Project, LLC | Wind | 237 MW | 16 mi |
| Lost Creek Wind Energy Facility | Wind | 168 MW | 21 mi |
Frequently asked questions
- How much power can Conception produce?
- Conception has 50.4 MW of operating nameplate capacity across 1 generator as of August 2026.
- Who operates Conception?
- EIA lists CR Clearing, LLC as the operator of Conception.
- How much electricity did Conception generate?
- Conception reported 97 GWh of net generation in 2023, according to EPA eGRID.
Source: U.S. Energy Information Administration, Form EIA-860M (August 2026); U.S. EPA eGRID2023 · Data for August 2026