Checked
Hayhurst New Mexico Solar
20.0 MW solar power plant · Eddy County, New Mexico
- Operating capacity
- 20.0 MW
- 1 generator
- Main fuel
- Solar
- First unit online
- 2023
- Generation, 2023
- 6,046 MWh
Plant details
- EIA plant ID
- 66412
- Operator
- Hayhurst New Mexico Solar
- Sector
- IPP Non-CHP
- County
- Eddy County
- Balancing authority
- SWPP
- Location
- 32.0707, -104.1616
Operating generators
Nameplate capacity and the month each began operating
Swipe the table sideways to see more columns.
| Generator | Fuel | Capacity | Online | Status |
|---|---|---|---|---|
| HHNMSolar Photovoltaic | Solar | 20.0 MW | Aug 2023 | Operating |
Generation and emissions, 2023
EPA eGRID annual data
- Net generation
- 6,046 MWh
- Capacity factor
- 3.5%
Nearby power plants
Within 25 miles
Swipe the table sideways to see more columns.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| AETS Old Michigan Solar LLC | Solar | 10.0 MW | 17 mi |
| Hayhurst Texas Solar | Solar | 24.8 MW | 18 mi |
| Screwbean | Battery storage | 9.9 MW | 18 mi |
| SPS5 Hopi | Solar | 10.1 MW | 19 mi |
Frequently asked questions
- How much power can Hayhurst New Mexico Solar produce?
- Hayhurst New Mexico Solar has 20.0 MW of operating nameplate capacity across 1 generator as of August 2026.
- Who operates Hayhurst New Mexico Solar?
- EIA lists Hayhurst New Mexico Solar as the operator of Hayhurst New Mexico Solar.
- How much electricity did Hayhurst New Mexico Solar generate?
- Hayhurst New Mexico Solar reported 6,046 MWh of net generation in 2023, according to EPA eGRID.
Source: U.S. Energy Information Administration, Form EIA-860M (August 2026); U.S. EPA eGRID2023 · Data for August 2026