Arrow Canyon Solar Hybrid
275 MW solar power plant · Clark County, Nevada
- Operating capacity
- 275 MW
- 2 generators
- Main fuel
- Solar
- First unit online
- 2023
- Generation, 2023
- 630 GWh
Plant details
- EIA plant ID
- 62248
- Operator
- Arrow Canyon Solar LLC
- Sector
- IPP Non-CHP
- County
- Clark County
- Balancing authority
- NEVP
- Battery energy
- 375 MWh
- Location
- 36.4593, -114.8444
Capacity by fuel
Operating generators
- Solar200 MW 72.7%
- Battery storage75.0 MW 27.3%
Operating generators
Nameplate capacity and the month each began operating
Swipe the table sideways to see more columns.
| Generator | Fuel | Capacity | Online | Status |
|---|---|---|---|---|
| 1Solar Photovoltaic | Solar | 200 MW | Dec 2023 | Operating |
| 2Batteries | Battery storage | 75.0 MW | Dec 2023 | Operating |
Generation and emissions, 2023
EPA eGRID annual data
- Net generation
- 630 GWh
- Capacity factor
- 26.2%
Nearby power plants
Within 25 miles
Swipe the table sideways to see more columns.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Gemini Solar Hybrid | Solar | 1.1 GW | 2.2 mi |
| Dry Lake Solar Energy Center | Solar | 250 MW | 3.4 mi |
| Harry Allen | Natural gas | 745 MW | 3.8 mi |
| Playa Solar 2 | Solar | 100 MW | 5.0 mi |
| Playa Solar 1, LLC | Solar | 79.0 MW | 5.0 mi |
| Harry Allen Solar Energy LLC | Solar | 100 MW | 6.0 mi |
| Moapa Southern Paiute | Solar | 250 MW | 6.4 mi |
| Chuck Lenzie Generating Station | Natural gas | 1.5 GW | 6.8 mi |
Frequently asked questions
- How much power can Arrow Canyon Solar Hybrid produce?
- Arrow Canyon Solar Hybrid has 275 MW of operating nameplate capacity across 2 generators as of August 2026.
- Who operates Arrow Canyon Solar Hybrid?
- EIA lists Arrow Canyon Solar LLC as the operator of Arrow Canyon Solar Hybrid.
- How much electricity did Arrow Canyon Solar Hybrid generate?
- Arrow Canyon Solar Hybrid reported 630 GWh of net generation in 2023, according to EPA eGRID.