Arrow Canyon Solar Hybrid

275 MW solar power plant · Clark County, Nevada

Operating capacity
275 MW
2 generators
Main fuel
Solar
First unit online
2023
Generation, 2023
630 GWh

Plant details

EIA plant ID
62248
Operator
Arrow Canyon Solar LLC
Sector
IPP Non-CHP
Balancing authority
NEVP
Battery energy
375 MWh

Capacity by fuel

Operating generators

  • Solar200 MW 72.7%
  • Battery storage75.0 MW 27.3%

Operating generators

Nameplate capacity and the month each began operating

Swipe the table sideways to see more columns.

GeneratorFuelCapacityOnlineStatus
1Solar PhotovoltaicSolar200 MWDec 2023Operating
2BatteriesBattery storage75.0 MWDec 2023Operating

Generation and emissions, 2023

EPA eGRID annual data

Net generation
630 GWh
Capacity factor
26.2%

Nearby power plants

Within 25 miles

Swipe the table sideways to see more columns.

PlantFuelCapacityDistance
Gemini Solar HybridSolar1.1 GW2.2 mi
Dry Lake Solar Energy CenterSolar250 MW3.4 mi
Harry AllenNatural gas745 MW3.8 mi
Playa Solar 2Solar100 MW5.0 mi
Playa Solar 1, LLCSolar79.0 MW5.0 mi
Harry Allen Solar Energy LLCSolar100 MW6.0 mi
Moapa Southern PaiuteSolar250 MW6.4 mi
Chuck Lenzie Generating StationNatural gas1.5 GW6.8 mi

Frequently asked questions

How much power can Arrow Canyon Solar Hybrid produce?
Arrow Canyon Solar Hybrid has 275 MW of operating nameplate capacity across 2 generators as of August 2026.
Who operates Arrow Canyon Solar Hybrid?
EIA lists Arrow Canyon Solar LLC as the operator of Arrow Canyon Solar Hybrid.
How much electricity did Arrow Canyon Solar Hybrid generate?
Arrow Canyon Solar Hybrid reported 630 GWh of net generation in 2023, according to EPA eGRID.

Source: U.S. Energy Information Administration, Form EIA-860M (August 2026); U.S. EPA eGRID2023 · Data for August 2026