Galena 2 Geothermal Power Plant
16.5 MW geothermal power plant · Washoe County, Nevada
- Operating capacity
- 16.5 MW
- 2 generators
- Main fuel
- Geothermal
- First unit online
- 2007
- Generation, 2023
- 38 GWh
Plant details
- EIA plant ID
- 56540
- Operator
- Ormat Nevada Inc
- Sector
- IPP Non-CHP
- County
- Washoe County
- Balancing authority
- NEVP
- Location
- 39.3732, -119.7645
Capacity by fuel
Operating generators
- Geothermal13.5 MW 81.8%
- Solar3.0 MW 18.2%
Operating generators
Nameplate capacity and the month each began operating
Swipe the table sideways to see more columns.
| Generator | Fuel | Capacity | Online | Status |
|---|---|---|---|---|
| GEN1Geothermal | Geothermal | 13.5 MW | Apr 2007 | Operating |
| GLSOLSolar Photovoltaic | Solar | 3.0 MW | Jul 2022 | Operating |
Generation and emissions, 2023
EPA eGRID annual data
- Net generation
- 38 GWh
- Capacity factor
- 26.4%
- CO2 emissions
- None reported
Nearby power plants
Within 25 miles
Swipe the table sideways to see more columns.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Steamboat Hills LP | Geothermal | 37.2 MW | 0.3 mi |
| Richard Burdette Geothermal | Geothermal | 26.0 MW | 1.3 mi |
| Galena 3 Geothermal Power Plant | Geothermal | 31.6 MW | 1.4 mi |
| Steamboat III | Geothermal | 26.1 MW | 1.7 mi |
| Steamboat II | Geothermal | 26.1 MW | 1.8 mi |
| Verdi | Hydroelectric | 2.4 MW | 10 mi |
| Fleish | Hydroelectric | 2.5 MW | 11 mi |
| Waste Management Lockwood LFGTE | Biomass | 3.2 MW | 11 mi |
Frequently asked questions
- How much power can Galena 2 Geothermal Power Plant produce?
- Galena 2 Geothermal Power Plant has 16.5 MW of operating nameplate capacity across 2 generators as of August 2026.
- Who operates Galena 2 Geothermal Power Plant?
- EIA lists Ormat Nevada Inc as the operator of Galena 2 Geothermal Power Plant.
- How much electricity did Galena 2 Geothermal Power Plant generate?
- Galena 2 Geothermal Power Plant reported 38 GWh of net generation in 2023, according to EPA eGRID.
Source: U.S. Energy Information Administration, Form EIA-860M (August 2026); U.S. EPA eGRID2023 · Data for August 2026