Techren Solar IV LLC
25.0 MW solar power plant · Clark County, Nevada
- Operating capacity
- 25.0 MW
- 1 generator
- Main fuel
- Solar
- First unit online
- 2020
- Generation, 2023
- 59 GWh
Plant details
- EIA plant ID
- 61932
- Operator
- Techren Solar IV LLC
- Sector
- IPP Non-CHP
- County
- Clark County
- Balancing authority
- NEVP
- Location
- 35.8927, -114.9365
Operating generators
Nameplate capacity and the month each began operating
Swipe the table sideways to see more columns.
| Generator | Fuel | Capacity | Online | Status |
|---|---|---|---|---|
| TECH4Solar Photovoltaic | Solar | 25.0 MW | Oct 2020 | Operating |
Generation and emissions, 2023
EPA eGRID annual data
- Net generation
- 59 GWh
- Capacity factor
- 26.9%
Nearby power plants
Within 25 miles
Swipe the table sideways to see more columns.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Techren Solar V | Solar | 50.0 MW | 0.8 mi |
| Copper Mountain Solar 3 | Solar | 255 MW | 1.2 mi |
| Techren Solar II LLC | Solar | 200 MW | 2.1 mi |
| Boulder Solar II, LLC | Solar | 50.0 MW | 3.0 mi |
| Techren Solar I LLC | Solar | 100 MW | 3.6 mi |
| Techren Solar III LLC | Solar | 25.0 MW | 3.9 mi |
| Townsite Solar Project Hybrid | Solar | 270 MW | 4.3 mi |
| Boulder Solar Power, LLC | Solar | 100 MW | 4.5 mi |
Frequently asked questions
- How much power can Techren Solar IV LLC produce?
- Techren Solar IV LLC has 25.0 MW of operating nameplate capacity across 1 generator as of August 2026.
- Who operates Techren Solar IV LLC?
- EIA lists Techren Solar IV LLC as the operator of Techren Solar IV LLC.
- How much electricity did Techren Solar IV LLC generate?
- Techren Solar IV LLC reported 59 GWh of net generation in 2023, according to EPA eGRID.