Techren Solar IV LLC

25.0 MW solar power plant · Clark County, Nevada

Operating capacity
25.0 MW
1 generator
Main fuel
Solar
First unit online
2020
Generation, 2023
59 GWh

Plant details

EIA plant ID
61932
Operator
Techren Solar IV LLC
Sector
IPP Non-CHP
Balancing authority
NEVP

Operating generators

Nameplate capacity and the month each began operating

Swipe the table sideways to see more columns.

GeneratorFuelCapacityOnlineStatus
TECH4Solar PhotovoltaicSolar25.0 MWOct 2020Operating

Generation and emissions, 2023

EPA eGRID annual data

Net generation
59 GWh
Capacity factor
26.9%

Nearby power plants

Within 25 miles

Swipe the table sideways to see more columns.

PlantFuelCapacityDistance
Techren Solar VSolar50.0 MW0.8 mi
Copper Mountain Solar 3Solar255 MW1.2 mi
Techren Solar II LLCSolar200 MW2.1 mi
Boulder Solar II, LLCSolar50.0 MW3.0 mi
Techren Solar I LLCSolar100 MW3.6 mi
Techren Solar III LLCSolar25.0 MW3.9 mi
Townsite Solar Project HybridSolar270 MW4.3 mi
Boulder Solar Power, LLCSolar100 MW4.5 mi

Frequently asked questions

How much power can Techren Solar IV LLC produce?
Techren Solar IV LLC has 25.0 MW of operating nameplate capacity across 1 generator as of August 2026.
Who operates Techren Solar IV LLC?
EIA lists Techren Solar IV LLC as the operator of Techren Solar IV LLC.
How much electricity did Techren Solar IV LLC generate?
Techren Solar IV LLC reported 59 GWh of net generation in 2023, according to EPA eGRID.

Source: U.S. Energy Information Administration, Form EIA-860M (August 2026); U.S. EPA eGRID2023 · Data for August 2026