Skip to content

Checked

Aberdeen CT

111 MW natural gas power plant · Brown County, South Dakota

Operating capacity
111 MW
2 generators
Main fuel
Natural gas
First unit online
1978
Planned additions
32.0 MW

Plant details

EIA plant ID
3338
Sector
Electric Utility
Balancing authority
SWPP

Capacity by fuel

Operating generators

  • Natural gas82.2 MW 74.1%
  • Petroleum28.8 MW 25.9%

Operating generators

Nameplate capacity and the month each began operating

Swipe the table sideways to see more columns.

GeneratorFuelCapacityOnlineStatus
2Natural Gas Fired Combustion TurbineNatural gas82.2 MWApr 2013Operating
GT1Petroleum LiquidsPetroleum28.8 MWMay 1978Operating

Planned generators

Expected start date as reported by the owner

Swipe the table sideways to see more columns.

GeneratorFuelCapacityExpectedStatus
3Natural Gas Fired Combustion TurbineNatural gas16.0 MWOct 2026Under construction, more than 50 percent complete
4Natural Gas Fired Combustion TurbineNatural gas16.0 MWOct 2026Under construction, more than 50 percent complete

Generation and emissions, 2023

EPA eGRID annual data

Net generation
40 GWh
Capacity factor
4.1%
CO2 emissions
25,226 tons
CO2 emission rate
1,276 lb/MWh

Nearby power plants

Within 25 miles

Swipe the table sideways to see more columns.

PlantFuelCapacityDistance
Groton Generation StationNatural gas216 MW20 mi

Frequently asked questions

How much power can Aberdeen CT produce?
Aberdeen CT has 111 MW of operating nameplate capacity across 2 generators as of August 2026.
Who operates Aberdeen CT?
EIA lists NorthWestern Energy - (SD) as the operator of Aberdeen CT.
How much electricity did Aberdeen CT generate?
Aberdeen CT reported 40 GWh of net generation in 2023 and 25,226 tons of carbon dioxide emissions, according to EPA eGRID.

Source: U.S. Energy Information Administration, Form EIA-860M (August 2026); U.S. EPA eGRID2023 · Data for August 2026