Aggreko MSR Grid PC7

10.0 MW battery storage power plant · Cameron County, Texas

Operating capacity
10.0 MW
1 generator
Main fuel
Battery storage
First unit online
2026

Plant details

EIA plant ID
69418
Operator
AETS AM LLC
Sector
IPP Non-CHP
Balancing authority
ERCO
Battery energy
19 MWh

Operating generators

Nameplate capacity and the month each began operating

Swipe the table sideways to see more columns.

GeneratorFuelCapacityOnlineStatus
PC7BatteriesBattery storage10.0 MWApr 2026Operating

Nearby power plants

Within 25 miles

Swipe the table sideways to see more columns.

PlantFuelCapacityDistance
Wal456Natural gas1.2 MW1.8 mi
Villa CavasosPetroleum9.0 MW4.8 mi
SMT Los Fresnos LLCBattery storage10.0 MW5.0 mi
Silas RayNatural gas143 MW6.1 mi
Regis LaurelesBattery storage9.9 MW8.5 mi
San Roman Wind I, LLCWind95.3 MW12 mi
Cameron Wind 1 LLCWind181 MW14 mi
VaqueroPetroleum9.0 MW14 mi

Frequently asked questions

How much power can Aggreko MSR Grid PC7 produce?
Aggreko MSR Grid PC7 has 10.0 MW of operating nameplate capacity across 1 generator as of August 2026.
Who operates Aggreko MSR Grid PC7?
EIA lists AETS AM LLC as the operator of Aggreko MSR Grid PC7.

Source: U.S. Energy Information Administration, Form EIA-860M (August 2026) · Data for August 2026