Checked
Aggreko MSR Grid PC7
10.0 MW battery storage power plant · Cameron County, Texas
- Operating capacity
- 10.0 MW
- 1 generator
- Main fuel
- Battery storage
- First unit online
- 2026
Plant details
- EIA plant ID
- 69418
- Operator
- AETS AM LLC
- Sector
- IPP Non-CHP
- County
- Cameron County
- Balancing authority
- ERCO
- Battery energy
- 19 MWh
- Location
- 26.0014, -97.5218
Operating generators
Nameplate capacity and the month each began operating
Swipe the table sideways to see more columns.
| Generator | Fuel | Capacity | Online | Status |
|---|---|---|---|---|
| PC7Batteries | Battery storage | 10.0 MW | Apr 2026 | Operating |
Nearby power plants
Within 25 miles
Swipe the table sideways to see more columns.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Wal456 | Natural gas | 1.2 MW | 1.8 mi |
| Villa Cavasos | Petroleum | 9.0 MW | 4.8 mi |
| SMT Los Fresnos LLC | Battery storage | 10.0 MW | 5.0 mi |
| Silas Ray | Natural gas | 143 MW | 6.1 mi |
| Regis Laureles | Battery storage | 9.9 MW | 8.5 mi |
| San Roman Wind I, LLC | Wind | 95.3 MW | 12 mi |
| Cameron Wind 1 LLC | Wind | 181 MW | 14 mi |
| Vaquero | Petroleum | 9.0 MW | 14 mi |
Frequently asked questions
- How much power can Aggreko MSR Grid PC7 produce?
- Aggreko MSR Grid PC7 has 10.0 MW of operating nameplate capacity across 1 generator as of August 2026.
- Who operates Aggreko MSR Grid PC7?
- EIA lists AETS AM LLC as the operator of Aggreko MSR Grid PC7.
Source: U.S. Energy Information Administration, Form EIA-860M (August 2026) · Data for August 2026