Skip to content

Checked

Lower Connecticut River Valley Planning Region, CT Energy

Electric utilities, power plants and charging stations in Lower Connecticut River Valley Planning Region, Connecticut.

Connecticut home electricity
24.16¢/kWh
July 2026
Regular gas, region
$4.25/gal
New England (PADD 1A)
EV charging stations
83
266 ports

EV charging in Lower Connecticut River Valley Planning Region

83 public stations, DC fast first

All 83

Power plants in Lower Connecticut River Valley Planning Region

1.8 GW of operating capacity

Swipe the table sideways to see more columns.

PlantFuelCapacity
MiddletownPetroleum786 MW
Kleen Energy SystemsNatural gas693 MW
GenConn Middletown LLCPetroleum242 MW
DWW Solar llSolar36.9 MW
Wesleyan University Cogen 1Natural gas2.4 MW
CP East Hampton I & II SolarSolar2.0 MW
FedEx MiddletownSolar1.5 MW
CP Middletown Solar I LLCSolar1.0 MW
CP Middletown Solar II LLCSolar1.0 MW
FDX010.0 FedEx Fuel CellNatural gas1.0 MW

Electricity rates and gas prices are state or regional averages. Utility service areas come from EIA Form 861 and are listed by county, so a utility listed here may not serve every address in the county.

Frequently asked questions

How many EV charging stations are in Lower Connecticut River Valley Planning Region?
There are 83 public EV charging stations in Lower Connecticut River Valley Planning Region with 266 ports, 6 of them with DC fast charging.
Are there power plants in Lower Connecticut River Valley Planning Region?
Yes. Lower Connecticut River Valley Planning Region has 10 operating power plants with 1.8 GW of capacity. The largest is Middletown (786 MW, petroleum).