Rainbow (MT)

59.0 MW hydroelectric power plant · Cascade County, Montana

Operating capacity
59.0 MW
1 generator
Main fuel
Hydroelectric
First unit online
2013
Generation, 2023
395 GWh

Plant details

EIA plant ID
2193
Operator
NorthWestern Energy (MT Hydro)
Sector
Electric Utility
Balancing authority
NWMT

Operating generators

Nameplate capacity and the month each began operating

Swipe the table sideways to see more columns.

GeneratorFuelCapacityOnlineStatus
RAI9Conventional HydroelectricHydroelectric59.0 MWMar 2013Operating

Retired generators

Retired since 2010

Swipe the table sideways to see more columns.

GeneratorFuelCapacityRetiredStatus
RAI7Conventional HydroelectricHydroelectric5.8 MWRetired Apr 2013Retired
RAI8Conventional HydroelectricHydroelectric5.8 MWRetired Apr 2013Retired
RAI1Conventional HydroelectricHydroelectric4.5 MWRetired Apr 2013Retired
RAI2Conventional HydroelectricHydroelectric4.5 MWRetired Apr 2013Retired
RAI3Conventional HydroelectricHydroelectric4.0 MWRetired Apr 2013Retired
RAI4Conventional HydroelectricHydroelectric4.0 MWRetired Apr 2013Retired
RAI5Conventional HydroelectricHydroelectric4.0 MWRetired Apr 2013Retired
RAI6Conventional HydroelectricHydroelectric4.0 MWRetired Apr 2013Retired

Generation and emissions, 2023

EPA eGRID annual data

Net generation
395 GWh
Capacity factor
76.4%

Nearby power plants

Within 25 miles

Swipe the table sideways to see more columns.

PlantFuelCapacityDistance
CochraneHydroelectric59.4 MW0.5 mi
Black Eagle Solar, LLCSolar3.0 MW2.5 mi
Black EagleHydroelectric26.7 MW2.8 mi
RyanHydroelectric55.2 MW4.6 mi
MoronyHydroelectric63.0 MW7.5 mi
Horseshoe Bend Wind ParkWind9.7 MW11 mi

Frequently asked questions

How much power can Rainbow (MT) produce?
Rainbow (MT) has 59.0 MW of operating nameplate capacity across 1 generator as of August 2026.
Who operates Rainbow (MT)?
EIA lists NorthWestern Energy (MT Hydro) as the operator of Rainbow (MT).
How much electricity did Rainbow (MT) generate?
Rainbow (MT) reported 395 GWh of net generation in 2023, according to EPA eGRID.

Source: U.S. Energy Information Administration, Form EIA-860M (August 2026); U.S. EPA eGRID2023 · Data for August 2026