Checked
1045 Tomlin Mill Solar
4.9 MW solar power plant · Iredell County, North Carolina
- Operating capacity
- 4.9 MW
- 1 generator
- Main fuel
- Solar
- First unit online
- 2021
- Generation, 2023
- 8,127 MWh
Plant details
- EIA plant ID
- 63448
- Operator
- 1045 Tomlin Mill Solar, LLC
- Sector
- IPP Non-CHP
- County
- Iredell County
- Balancing authority
- DUK
- Location
- 35.9162, -80.8355
Operating generators
Nameplate capacity and the month each began operating
Swipe the table sideways to see more columns.
| Generator | Fuel | Capacity | Online | Status |
|---|---|---|---|---|
| 1045Solar Photovoltaic | Solar | 4.9 MW | May 2021 | Operating |
Generation and emissions, 2023
EPA eGRID annual data
- Net generation
- 8,127 MWh
- Capacity factor
- 18.9%
Nearby power plants
Within 25 miles
Swipe the table sideways to see more columns.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Statesville Delivery No 3 | Petroleum | 2.2 MW | 8.3 mi |
| Statesville, Highway 64 | Petroleum | 1.8 MW | 10 mi |
| Iredell County LFG Facility | Biomass | 3.2 MW | 10 mi |
| Tripple State Farm | Solar | 5.0 MW | 13 mi |
| Statesville Solar | Solar | 5.0 MW | 14 mi |
| Ashley Solar Farm | Solar | 4.0 MW | 15 mi |
| Stikeleather Farm | Solar | 5.0 MW | 15 mi |
| Mocksville Solar | Solar | 15.4 MW | 16 mi |
Frequently asked questions
- How much power can 1045 Tomlin Mill Solar produce?
- 1045 Tomlin Mill Solar has 4.9 MW of operating nameplate capacity across 1 generator as of August 2026.
- Who operates 1045 Tomlin Mill Solar?
- EIA lists 1045 Tomlin Mill Solar, LLC as the operator of 1045 Tomlin Mill Solar.
- How much electricity did 1045 Tomlin Mill Solar generate?
- 1045 Tomlin Mill Solar reported 8,127 MWh of net generation in 2023, according to EPA eGRID.
Source: U.S. Energy Information Administration, Form EIA-860M (August 2026); U.S. EPA eGRID2023 · Data for August 2026