Checked
Innovative Solar 67
33.3 MW solar power plant · Pender County, North Carolina
- Operating capacity
- 33.3 MW
- 1 generator
- Main fuel
- Solar
- First unit online
- 2018
- Generation, 2023
- 69 GWh
Plant details
- EIA plant ID
- 59678
- Operator
- John Laing US Solar Corp.
- Sector
- IPP Non-CHP
- County
- Pender County
- Balancing authority
- CPLE
- Location
- 34.6233, -78.0054
Operating generators
Nameplate capacity and the month each began operating
Swipe the table sideways to see more columns.
| Generator | Fuel | Capacity | Online | Status |
|---|---|---|---|---|
| IS067Solar Photovoltaic | Solar | 33.3 MW | Dec 2018 | Operating |
Generation and emissions, 2023
EPA eGRID annual data
- Net generation
- 69 GWh
- Capacity factor
- 23.6%
Nearby power plants
Within 25 miles
Swipe the table sideways to see more columns.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Crooked Run | Solar | 70.1 MW | 4.0 mi |
| Bearford Solar II | Solar | 4.9 MW | 4.4 mi |
| Bearford Farm Solar Project | Solar | 5.0 MW | 4.7 mi |
| Willard Solar | Solar | 5.0 MW | 5.8 mi |
| Brick City Solar | Solar | 5.0 MW | 7.2 mi |
| Burgaw Solar, LLC | Solar | 5.0 MW | 8.0 mi |
| Scotch Bonnet Solar, LLC | Solar | 4.5 MW | 8.1 mi |
| Nickelson Solar, LLC | Solar | 5.3 MW | 8.6 mi |
Frequently asked questions
- How much power can Innovative Solar 67 produce?
- Innovative Solar 67 has 33.3 MW of operating nameplate capacity across 1 generator as of August 2026.
- Who operates Innovative Solar 67?
- EIA lists John Laing US Solar Corp. as the operator of Innovative Solar 67.
- How much electricity did Innovative Solar 67 generate?
- Innovative Solar 67 reported 69 GWh of net generation in 2023, according to EPA eGRID.
Source: U.S. Energy Information Administration, Form EIA-860M (August 2026); U.S. EPA eGRID2023 · Data for August 2026