Checked
Foxtail Wind, LLC
150 MW wind power plant · Dickey County, North Dakota
- Operating capacity
- 150 MW
- 1 generator
- Main fuel
- Wind
- First unit online
- 2020
- Generation, 2023
- 579 GWh
Plant details
- EIA plant ID
- 61747
- Operator
- Foxtail Wind, LLC
- Sector
- Electric Utility
- County
- Dickey County
- Balancing authority
- MISO
- Location
- 46.0982, -98.8801
Operating generators
Nameplate capacity and the month each began operating
Swipe the table sideways to see more columns.
| Generator | Fuel | Capacity | Online | Status |
|---|---|---|---|---|
| 1Onshore Wind Turbine | Wind | 150 MW | Jan 2020 | Operating |
Generation and emissions, 2023
EPA eGRID annual data
- Net generation
- 579 GWh
- Capacity factor
- 44.0%
Nearby power plants
Within 25 miles
Swipe the table sideways to see more columns.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Merricourt Wind Energy Center | Wind | 150 MW | 8.6 mi |
| Tatanka Wind Power LLC | Wind | 180 MW | 10 mi |
| FPL Energy North Dakota Wind I/II | Wind | 61.5 MW | 16 mi |
Frequently asked questions
- How much power can Foxtail Wind, LLC produce?
- Foxtail Wind, LLC has 150 MW of operating nameplate capacity across 1 generator as of August 2026.
- Who operates Foxtail Wind, LLC?
- EIA lists Foxtail Wind, LLC as the operator of Foxtail Wind, LLC.
- How much electricity did Foxtail Wind, LLC generate?
- Foxtail Wind, LLC reported 579 GWh of net generation in 2023, according to EPA eGRID.
Source: U.S. Energy Information Administration, Form EIA-860M (August 2026); U.S. EPA eGRID2023 · Data for August 2026